The path to dry wallsExpect visible resultsAs soon as the EDS system is activated, the drying process begins.The chart below illustrates the different stages of the process:
As a rule, EDS will dry walls within 6 to 24 months; the time frame depends on wall thickness and other physical factors. In practice, the expected levels of dryness will be reached within 6 months. In the event that the EDS system does not remedy your capillary draw problems, the equipment can be returned and you will be fully refunded.
|
|






