The path to dry walls


Expect visible results


As soon as the EDS system is activated, the drying process begins.The chart below illustrates the different stages of the process:


  • Assessment (1)
  • Reduction stage (2)
  • Reduction and gain consolidation stage (3)
  • Safeguarding stage (4)

As a rule, EDS will dry walls within 6 to 24 months; the time frame depends on wall thickness and other physical factors. In practice, the expected levels of dryness will be reached within 6 months.


In the event that the EDS system does not remedy your capillary draw problems, the equipment can be returned and you will be fully refunded.
Before and after; long lasting protection thanks to EDS


stat.7

haus5


haus6